Home > Buy Now > KAST Engineering Co., Ltd. > Testers for Car Electric Paris
 


KAST Engineering Co., Ltd.
 
icon Digital Surge Tester
icon Hi-Pot Tester
icon Insulation Tester
icon Hi-pot & Insulation Tester
icon Impulse Generator
icon ESD Tester
icon Resistance Tester
icon Motor Test System
icon Stator Test System
icon Rotor Test System
icon Transformer Test System
icon H.V Reed Relay
icon Lightning Impulse Simulation Tester
icon Testers for Car Electric Paris

line

icon Company Profile
icon Selling Leads
icon Index
icon Bulletin Board
icon Guest Book

line


icon To Korean Page


http://www.gitc21.net


visitors: 21288
 
Contact us
KAST Engineering Co., Ltd.
[Korea]
Address:
387-1 Gupyung-dong, Gumi-city, Gyeongsangbuk-do 730-300 Korea
Phone:
82-54-4746490
Contact name:
Helen , Gen. Manager
Inquire now









KAST Engineering Co., Ltd.
 
Testers for Car Electric Paris

Test items for Car Electric Parts

Car electric parts
Tet
Test item/ condition
Devices
Inspection
Object
Test
(Equipment)
Test method
Starter Motor
Armature
Surge test
(Surge tester)
- Contact each pin to 4 pointsof commutator with 90 angle.
- Test between symm. pineswith electrical turning (3 times)
Short between commutators.
- Test voltage : 1~1.5kV
- Checking of coiled condition
Hipot
(Hipot tester)
- Between coil and core High voltage withstanding.
Alternator
Stator Coil & Rotor Coil
Surge test
(Surge tester)
- Test for each phase of 3Ø(2 times )
- Compare the duplicated waveforms (3 times)
Lay short, Turning short, Coiled condition, Misconnection.
- Test voltage : 1~1.5kV/sec.
Hipot
(Hipot tester)
- Between coil and core Insulation quality
Resist. Comparison
(Resistance tester)
- Test for each phase of 3Ø
( 2 times or 3 times)
Wire open of the twisted pair,Bad winding quality,Protection from other model mixing.
Magnet
Switch
Magnet Coil Surge test
(Surge tester)
- 2 times for right direction winding.
- 3 times for reverse direction
Layer short, Turning short, Coiled condition, Misconnection
- Test voltage : 1~1.5 KV
Contact point
(copper plate)
Gap 1 distance
Gap 2 distance
(Gap tester)
- Move plunger by air-cylinder and check Gap1 and Gap 2 sequentially. Assembled quality of spring.
Bad contact, Contact distance.
-Auto decision (Good/Bad).
Contact operating condition Contact voltage
(ON/OFF voltage) test
(Relay tester)
- Voltage increase ->ON test
Voltage decrease ->OFF test
Magnet's performance.
( operating condition of magnet)
- Auto decision (Good/Bad).
- Presetting of on/off voltage tolerance
Ignition Coil 1'st/ 2'nd Coil Surge test
(UHVG Surge tester)
- Apply 20~30KV to 2'nd coil (for generation of surge waveform)
- Measure 1'st and 2'nd coil.
Layer short, Corona,Coiled condition, Wire open.
Magnet Clutch
(Air Conditioner)
Magnet coil Surge test Between both ends of coil Layer short, Turning short, Wire open.
Hipot. Between coil and core High voltage withstanding.
Carburetor
Valve Solenoid coil (Duty, Slow Cut) Surge test Between both ends of coil Layer short, Turning short, Wire open.
Hipot. Between coil and core High voltage withstanding.
Resistance test Between both ends of coil
(comparison of resistance)
Resistance. Short, Open.
- Auto decision (Good/Bad).
Plunger ON/OFF voltage test (Relay tester) - Voltage increase -> ON vtg
- Voltage decrease -> OFF vtg
Plunger's performance
(operating condition of plunger)
Motors (Fan, Blow,Wiper, Power Window, etc) Armature Coil Surge test
(Surge tester)
- Contact each pin to 4 points of commutator with 90 angle.
- Test between symm. pines with electrical turning (3 times)
Commutator short, Layer short Coiled condition, Wire open.
Fusing test
(Resistance tester)
- Contact each pin to each commutator.
- Measure each resistance with electrical turning.
Bad connection
(between commutator and coil)
Hipot. Between coil and core. High voltage withstanding
Others (Relay,Solenoid) Magnet coil Surge test Between both ends of coil. Layer short, 1 time short, Coiled condition.
Hipot. Between coil and core. Coiled condition.
Resistance Between coil and core. Resistance tolerance
Total 0 Product